Mission workshop Β· Plan the whole spacecraft
Quick experimentBuild your satellite
- Houston
- 12 h response target
- Budget
- $37M / $320M
- Mass
- 90 / 650 kg
- Power
- 45 / 0 W
- Data / downlink
- 0 / 0 GB/day
- Storage
- 0 GB
Pick up a part and drop it on the highlighted mount. Click an installed module to remove it. Open the body to inspect battery and memory slots.
Detailed resource checks & engineering consequences
Resources: can the mission support it?
Incomplete design- MassOK
90 / 650 kg
560 kg launch allowance left
- PowerNOT SET
45 W used / 0 W generated
Choose a solar array
- BudgetOK
$37M / $320M
$283M left
- DataNOT SET
0 GB/day generated
Storage 0 GB Β· downlink 0 GB/day
- CommunicationsNOT SET
0 GB/day downlink for 0 GB/day
1 ground station Β· 8 min contact/day
- TimeNOT SET
12 h response target
Estimated downlink delay after each observation Β· 7-day mission
Design incomplete: Some required parts are not chosen yet.
The satellite cannot launch without every system.
Changes that would fix it:
- Choose at least one sensor in step 1.
- Choose an orbit in step 2.
- Choose a solar array in step 3.
- Choose a battery in step 3.
- Choose a radio in step 4.
- Choose storage in step 3.
Bus, launch & mission lifetime
- Supplied spacecraft bus
- 90 kg Β· $35M Β· 45 W
- Instrument mounts
- Up to 3 payloads
- Launch allowance
- 650 kg maximum Β· $320M total budget
- Scenario lifetime
- 7 days Β· first useful data within 12 h
This mission supplies one bus and a fixed launch allowance. Its replay duration is fixed so attempts use the same hazard timeline. Solar, battery, radio, orbit and storage choices still change the actual resource and reliability calculations; no unmodeled bus or rocket bonus is added.
1/8 Β· Choose, inspect, then continue.
90/650 kg45/0 W$37/$320M0/0 GB/day